Infrastructure ·
When our four-vCPU box stopped being enough
How we moved GetMeCab production to ARM, measured capacity, recovered from failed cutover rehearsals and retired the old host.
Read the storyEngineering journal
Notes from the engineers changing and operating GetMeCab. Each story includes the trade-offs, evidence and mistakes that shaped the result.
Infrastructure ·
How we moved GetMeCab production to ARM, measured capacity, recovered from failed cutover rehearsals and retired the old host.
Read the storyArchitecture ·
How GetMeCab is separating transactional ownership, defining safe fallback, and migrating its booking platform in small, reversible steps.
Read the story